CRANES - DOCK
GANTRY CRANES |
| |
|
DOCK GANTRY CRANE Q = 450t, L = 98,5m |
 |
|
| Total
hoisting of two trolleys |
450
t |
| Bridge span |
98,5 m |
| Travelling
speed of the dock gantry crane |
0,7-20
m/min |
| Hoisting height |
66 m |
| Lowering
depth |
2
m |
| Travelling speed of
the trolley |
0,7-20
m/min |
| Hoisting
speed |
0,2-6,3
m/min |
| |
|
|
|
| DOCK
GANTRY CRANE Q = 300t, L = 108m |
 |
|
| Total
hoisting of two trolleys |
300
t |
| Bridge span |
108 m |
| Travelling
speed of the dock gantry crane |
1-24
m/min |
| Hoisting height |
59/61 m |
| Lowering
depth |
3,5
m |
| Travelling speed of
the trolley |
0,3-7,8
m/min |
| Hoisting
speed |
0,25-6,3
m/min |
| |
|
|
|
| DOCK
GANTRY CRANE Q = 300t, L = 27,25m |
 |
|
| Total
hoisting of two trolleys |
300
t |
| Bridge span |
27,25 m |
| Travelling
speed of the dock gantry crane |
30
m/min |
| Hoisting height |
41,3/36
m |
| Lowering
depth |
3,5
m |
| Travelling speed of
the trolley |
0,3-7,4
m/min |
| Hoisting
speed |
0,25-7,9
m/min |
| |
|
|
|
| |
| |